01/21/04 - 02/14/04 (26 pictures)
Underpinning, slab removal, digging down
02/18/04 - 02/19/04 (14 pictures)
Scenes of devastation - New sewer line and water line
02/25/04 (5 pictures)
Subsoil Drain & waterproofing
03/09/04 (12 pictures)
Waste drains & preparation for steel I-Beam
03/12/04 (7 pictures)
Steel I-Beam installed
03/18/04 (5 pictures)
Preparation for pouring the new slab
03/23/04 (3 pictures)
The new slab & start of framing
04/06/04 (5 pictures)
Rough framing
04/25/04 (7 pictures)
New windows, window well, subfloor, ductwork
05/16/04 (9 pictures)
Rough Plumbing
06/29/04 (10 pictures)
Strucutured wiring
08/05/04 (6 pictures)
Drywall. Finally.
10/17/04 (6 pictures)
Drywall taped sanded & primed. Doors installed.
10/22/04 (3 pictures)
Heatmat installed, tiling begun
10/24/04 (3 pictures)
Bathroom tiling continued
10/27/04 (4 pictures)
Bathroom tiling continued
10/31/04 (5 pictures)
Bathroom tiling continued
11/03/04 (5 pictures)
Hardwood floor
11/14/04 (7 pictures)
Finish Plumbing
11/15/04 (5 pictures)
Shower Finish Plumbing
12/22/04 (8 pictures)
Finished floor, screen
There is also a thread about our project on the AVSForum here.